English Ðóññêèé Home page Contact us Site map Certificates Patents
Home page  
Production catalog Resolving documents Partners Contact us
  Tower
  Devices for grounding
  Insulating ladders and step-ladders
  Contact-type voltage detectors
  Operative and operative-universal insulating rods
  Other equipment
  Scaffolds
Combined scaffold from fiberglass plastic PSK.
Scaffold stepladder from fiberglass plastic PSO.
Insulating scaffold stepladders from fiberglass plastic PSS.
Insulating scaffold from fiberglass plastic PSI-0,6.
Scaffold from fiberglass plastic with the handrail transformable along the length of the stringer PST.
   
 
 
 

Scaffold from fiberglass plastic with the handrail transformable along the length of the stringer PST.

Óâåëè÷èòü Óâåëè÷èòü
  

Scaffold is intended to carry out repairing works in electric installation, industrial and administrative building and at the open air at the height of 4-6 m.

 

 

 

 

The main parameters of scaffolds:
Type of scaffold Parameters
Height of upper supporting, mm. Dimensions of upper supporting step, mm Dimensions of upper supporting step, mm
PST-4 4,0 270õ500 32
PST-5 5,0 270õ500 42
PST-6 6,0 270õ500 50

Scaffold consists of ladder and support connected with gear hinge and upper supporting platform with handrail.
Ladder and support consist of two elements with equal length, which connected one to another with hinging blocks for joining with catching handles.
Construction of the joining block provides necessary force for connecting and releasing elements, which not exceed 100N. The stages of the ladder's elements and lower part of supporting have trapezoidal form providing horizontal position of supporting surfaces.
For ensuring safe mounting and conducting work the set of supply includes brackets for attaching slings-tension members on the protecting enclosure of working platform.
For ensuring stability of the stringer the scaffold diverge to the low end.
The working surfaces of the steps have the coating averting sliding of the worker's shoe's soles.
The scaffold includes devices adverting occasional opening during work and transportation.
Sequence of mounting:
1. Opening and fixing ladder and support by mean of hinging blocks;
2. Mounting and fixing elements of rigidity and struts;
3. Mounting of scaffold to working position by means of fixing slings-tension members;
The time for mounting and erection to vertical position by two workers is 5-7 min.

ekipage@ukrpost.ua
www.ekipage.com
contact Enakievskaya str. 4, Kharkov, Ukraine, 61001
Phone: +380 572 933122, +380 57 7780161
Phone/Fax: +380 572 933147, 931003